top of page

Highway 401/403/410 Interchange Structure Rehabilitation

Client

Ministry of Transportation

Project Team

Moon - Matz Ltd. (Electrical)

Construction Budget Cost

$ 100 Million

Project description

This Ministry of Transportation assignment included the strategic planning for the rehabilitation of all structures, within the 401/410/403 Interchange and along Highway 401 between Highway 401 and Highway 427 (excluding Dixie/401 structures). There are thirty (30) structures in total. Electrical work included preliminary and detailed design for high mast and conventional lighting and underpass lighting systems with surface mounted / embedded ducts. Traffic counting stations and classifier loops were reinstated within the project limits. Electrical work also included upgrading the existing municipal illumination and all temporary illumination for staging, detour and traffic management and construction access.

bottom of page