White Oaks Swimming Pool
Client
Town of Oakville
​
Project Team
Moon - Matz Ltd. (Mechanical, Electrical, Structural)
​
Construction Budget Cost
$ 600,00.00
​


Project description
​
Moon-Matz Ltd. was the prime consultant responsible for architectural, structural, mechanical and electrical upgrades to the White Oaks Swimming Pool for the Town of Oakville.
Mechanical work included the replacement of the sand filter, recirculation pumps, new digital chemical controls, chemical storage tanks, piping, drainage, skimmers, and water heating system.
Electrical work included power distribution for pumps, chemical controllers and connection of pool safety mechanisms (siren, lights, emergency stop buttons).
Structural and Architectural scope of work included saw cut and removal of slab on grade pool deck to facilitate pipe replacement, pool deck mosaic tile, epoxy paint finish on pool tanks, painting, epoxy flooring and removable starting platforms.